亚洲香蕉,国产精品久久久久久久久久,久久精品无码免费不卡,国产精品无码A∨精品影院

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :2906 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: sun8888.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

少妇性活BBBBBBBBB四川| 激情欧美久久家庭| 色吧亚洲一区欧美二区| 无码中文字幕乱码一区| 日本久久午夜| 日韩无线视频免费观看| 97青草超碰久久国内精品91| 日韩网站一区| 日日夜夜国产传媒| 青青插av| 国产精品天干天干综合网| 欧美精品国产妇女| 91手机国产热久久| 日本久久网| 欧美操人| 最近国产在线观看| 丝袜情侣麻豆高潮| 99精品成人片免费毛片无码| 灰色视频深夜在线观看| AV区精品| 日韩欧美国产三级| 中文字幕网伊人乱| 通辽市| 国产蜜臀一区二区| 永久在线国产| 四川少妇被弄到高潮| 色呦呦免费视频入口| 欧美日韩一区二区二区| 久久久中文字幕| 亚洲人免费视频| 欧精品久久久久久| 久久精品人人爽| 欧美激情精品| 亚洲一区二区21p| 国产精品一码二码三码在线| 99久在线观看| 日韩专区 中文字幕| 开心伊人网| 超碰在线97动漫| 丁香激情九月| 成人自拍一区|