亚洲香蕉,国产精品久久久久久久久久,久久精品无码免费不卡,国产精品无码A∨精品影院

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

Technical Services Current Position:Home > Technical Services

Precautions for GCL construction

Release time:2020-4-7    This article is read :3611 Times

GCL construction

Precautions for GCL construction

1. The site should be kept relatively dry during construction, and the base surface can be wet, but there should be no water accumulation.

2. The laying, connection and interface of the GCL should meet the design requirements and construction specifications, and be firm and stable, without hollowing, damage, slippage, warping, wrinkling and other phenomena.

3. If the impermeable blanket is damaged during the laying process, a pair of GCLs larger than the damaged surface by 30cm ~ 50cm must be cut and covered, and the surrounding area should be coated with bentonite waterproof slurry. 4. After the GCL is laid and inspected, the construction of backfill shall be carried out simultaneously to avoid trample and damage.

5. The GCLs should be stacked in the designated place on the site, and be cushioned to maintain a certain distance from the ground, and covered with plastic film to avoid rainwater immersion, sunlight and moisture.

6. If it rains during the construction process, it should be covered immediately with plastic film materials or rain shielding materials to avoid rainwater soaking and washing the waterproof layer and affecting the construction quality. When the rain is large and the bentonite swells by more than 300%, it should be laid again.

7. The equipment or truck cannot be placed directly on the GCL, and the cover must be set to work.

8. When laying, it is strictly forbidden to put an open flame or cigarette butt on any side of the GCL, and it is strictly forbidden for construction personnel to wear spike shoes.

9. During the construction, if the construction party encounters unclear drawings or the construction site does not conform to the design of the drawings, it should be notified to the designer in time and properly resolved through consultation.

10. For other unfinished matters, the national and local acceptance standards and operating specifications shall be followed during construction.

Precautions for GCL construction
Previous:Comparative analysis of several geotextile materialsnext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: sun8888.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

网站一二色-| 妺妺窝人体色WWW在线小说| 亚洲无码中文字幕一区| 亚洲日韩熟妇AV片| 国产啪精品视频网站免| 国产高清无码1234| 久久免费视频免费视频| 承认在线亚洲| 国产精品久久99精品毛片三a| 91干干干| 天天操天天射天天搞| 女人被狂躁到高潮视频免费动态图| 激情中文| 亚洲淫淫淫网| 日韩殴美精品一区二区| 婷婷六月男人天堂| 久久国产一区二区三区| 精品人妻电影| 婷婷在线1区| 五月天亚州高清一区| 性久久五月丁香| 诱人的妺妺2中文在线观看车爱| 中国妓女卖婬偷拍视频| 日本久久电影视频看看| 6080国产精品无码| 亚洲第二区第三区| 一区不卡| 欧美高清不卡| 丁香激情六月| 影视免费的黄片、| 国产精品推荐一区二区| 国产一区二区三区无码视频| 男人草女人视频网站| 国产精品视频永久免费播放| 中文字幕乱码亚洲∧V日本| 女子自慰av免费网站| 久久老司机免费| 亚洲欧美韩精品| 国产免费av一区二区| 少妇被粗大的猛进出69影院| 天天艹夜夜操|